亚洲欧美日韩在线不卡-亚洲欧美日韩在线不卡中文-亚洲欧美日韩在线观看一-亚洲欧美日韩在线一区-亚洲欧美日韩在线中文一-亚洲欧美日韩在线综合第

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1222

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://www.01ze.cn//


主站蜘蛛池模板: 国产亚洲精品一区二三区| 欧美婷婷五月基地| 久操视频在线观看| 国产精拍视| 91久久精品在这里色伊人68| 四虎亚洲精品高清在线观看| 麻豆精品成人免费国产片| 国产熟女福利| av无码一区二区三区鸳鸯影院 | 香港三级日本三级韩国三| 免费观看又色又爽又黄的忠诚| 国产亚洲另类激情第二页| 波多野结衣与老人系列| 亚洲国产成人一区二区精品区 | 国产成人精品亚洲av无人区一区| 91麻豆国产极品在线播放| 色噜噜噜AV亚洲男人的天堂| 久久久久成人精品亚洲国产av综合| 国产精品毛片无遮挡| 2024国自产一点都不卡| 顶级少妇做爰视| 成人午夜爽A片免费视频| 亚洲精品欧美中文字幕| 美妇在家被强干小说| 国产免费a级片| 91女神在线观看| 日本怡春院欧美一区二区三区| 精品日韩欧美一区二区 | aⅴ三级综合| 熟女五十路开心久久伊人| 久久精品青青大伊人av| 国产av无码精品麻豆| 亚洲欧美人人| 卡一卡二卡三专区免费| 国产精品久久久久久看片| 在线中文字幕国产亚洲欧美| 欧美日韩一区二区成人| 国产日韩高清一区二区三区| 91热成人精品国产免费| 日本精品视频| 国产香蕉在线观看|